Skip to content
24-month warranty on every SWEST unit — service and genuine parts included

Sandwich panels: how to choose the right thickness for a cold room

Thickness is not a number you pick off a catalogue. It falls out of an equation between the operating temperature you need, the climate outside, and the electricity bill you will pay every month for the life of the room.

Cold rooms & warehouses8min read
ShareWhatsAppXLinkedIn
A cold room built with 100 mm panels, its condensing unit running on the roof.
A cold room built with 100 mm panels, its condensing unit running on the roof.
1 / 3

01What you are actually buying when you buy a sandwich panel

The core is the product; the steel is its wrapper

A panel is three layers: coated galvanised steel outside, an insulating core of polyurethane or rock wool, then steel again inside. Thermal performance comes from the core alone — its density, its consistency, the absence of voids. Thicker steel makes a mechanically stronger panel, but adds almost nothing to its resistance to heat. Ask about core density before you ask about sheet gauge.

Panels cut to the project's dimensions in the Swarwest workshop before they go to site.
Panels cut to the project's dimensions in the Swarwest workshop before they go to site.

The locking system decides build quality more than the panel does

An excellent panel fitted with poor joints leaks heat at every seam, and condenses moisture inside that seam until the edges corrode. A cam‑lock system pulls two panels together and compresses the gasket between them in a single movement, closing the joint thermally and mechanically at once. When you inspect a job, inspect the joint, not the panel face.

The panel edge reveals the insulating core between the two steel skins — and it is where the locking system sits.
The panel edge reveals the insulating core between the two steel skins — and it is where the locking system sits.

02Thickness follows the temperature difference, not the floor area

Start from the operating temperature

50 to 75 mm is enough for chilled rooms above zero: produce, drinks. 100 mm is the default for rooms between 0 and −5 °C. Freezing at −18 °C and below starts in practice at 150 mm, and reaches 200 mm in deep-freeze stores or where the roof takes direct sun all day.

The room before work starts: bare concrete, no insulation, a floor that needs levelling and a vapour barrier.
The room before work starts: bare concrete, no insulation, a floor that needs levelling and a vapour barrier.

Size for the worst day, not the average one

Shade temperature in Jeddah passes 45 °C in August. A freezer room at −18 °C means a difference of roughly 63 degrees across a single wall. Every centimetre of insulation you leave out becomes a permanent extra load on the compressor, and then a daily electricity draw that never stops. Insulation is paid for once; electricity is paid for every month.

An aisle inside a working cold room: goods on racking, air circulating with no hot spots.
An aisle inside a working cold room: goods on racking, air circulating with no hot spots.

03What separates a good project from one that draws twice the power

The floor and the roof are the parts people forget

Most quotations price the walls and leave the floor uninsulated. In a freezer that is an expensive mistake: moisture rises out of the concrete and freezes under the screed, lifting and cracking the floor within two seasons. Floor insulation and a vapour barrier are part of the system, not a line item to delete to bring the price down.

A steel frame before the panels go on — insulation is planned with the structure, not after it.
A steel frame before the panels go on — insulation is planned with the structure, not after it.

Ask for a heat-load calculation before you ask for a price

The number that sets your thickness and your unit capacity is the calculated heat load: surface area, temperature difference, how often the door opens each day, and the temperature of the goods coming in. Anyone who quotes you before that calculation is selling you panels, not a cold room that works.

The Swarwest team preparing panels: fabrication and installation under one roof.
The Swarwest team preparing panels: fabrication and installation under one roof.

Have a project like this? Our engineering team in Jeddah runs the load calculation, proposes the solution, and comes back with a detailed quotation within one working day.

We use analytics to understand how the site is used. Nothing runs until you agree. Privacy policy